A little update as well.....
The cooling system is now plumbed, the wastegate and BOV are installed, just waiting on the new carb.
Gotta move the master cylinder and redo the brake lines due to the exhaust routing.
Need to pull the trans out and replace the 3rd gear clutch packs.
After that, it's all the wiring and it gets buttoned back up.